Control Panel

Control Panel

A wide range of control panels are available. This to enable a flexible and strong product offering. New panels are added continuously to match market needs and demands.

The CP 114 is a single-pump version with a Variable Frequency Drive (VFD) up to 7.5A or 10A max. It does not have x-approval for standard three-phase pumps.

  • Compact control panel for one pump
  • Single-phase 230 VAC main supply to three-phase 230 VAC supply for pump
  • Panel comprising pump controller PC 111 and a VFD
  • 1.5 kW 7.5 A or 2.2 kW 10.5A versions
  • Prepared for battery back-up

The CP 112 and CP 212 are compact control panels for one or two pumps. They directly connect to pumps up to 5.5 kW (12A), and feature three-phase and single-phase versions. Ex-versions are also available.

  • Standard solution from stock
  • Low installation costs
    • Easy set-up
    • Can be installed by non-certified electrician
  • Extensive protection of pumps
    • Overheat, overload
    • Phase order (wrong rotation direction)
    • Phase missing
    • Leakage
    • Dry run protection by cos-phi monitoring
    • Space for earth leakage breaker
  • Easy to use by non-experts
    • Settings and readings in a 2x16 character display with multiple language support
  • Easy to search for errors
    • All alarms in clear text
  • Long, trouble-free operation
    • Robust cabinet and high-quality components

The CP 116 and 216 compact control panels for one or two pumps directly connect to pumps up to 5.5 KW (12A). The optional GSM/GPRS modem allows communication with AquaWeb or Supervisory Control and Data Acquisition (SCADA) systems using the Comli or Modbus protocols. Ex-versions are also available.

  • Standard solution from stock
  • Low installation costs
    • Easy set-up
    • Can be installed by non-certified electrician
  • Extensive protection of pumps
    • Overheat, overload
    • Phase order (wrong rotation direction)
    • Phase missing
    • Leakage
    • Dry run protection by cos-phi monitoring
    • Space for earth leakage breaker
  • Easy to use by non-experts
    • Settings and readings in a 2x16 character display with multiple language support
  • Numerous control functions reduce
    • Number of service visits
    • Energy consumption
  • Complete surveillance of pumps and station
    • Transferring of alarms to central system over telemetry
    • Measuring and recording of station and equipment performance

The CP 221 control panel provides a complete solution for two-pump sewage pumping stations. It is built around the ABS PC 242 controller with advanced control and monitoring features to ensure optimum performance and reliability over the whole life cycle of the station.

  • Standard solution from stock
  • Quick and easy to install, set-up and operate
  • Numerous control functions reduce:
    • Easy set-up
    • Can be installed by non-certified electrician
  • Complete surveillance of pumps and station
  • Fast alarm response by transferring of alarms to central system over telemetry
  • Station and network optimization by measuring and recording station and equipment performance
  • Long trouble-free operation thanks to robust cabinet and high-quality components
New Jewel Mart
New Jewel Mart
Chat With Us